Skip to content
BUILTWISECONSTRUCTION

Warehouse and industrial builders in Fraser Coast

Builtwise designs and builds warehouses, workshops and industrial buildings in Fraser Coast, from site and zoning checks through approvals to handover. Fraser Coast Regional Council assesses development under the Fraser Coast Planning Scheme 2014, and the site's zone, overlays and access shape every project here.

Building in Fraser Coast: what shapes a project

Manufacturing is growing on the Fraser Coast. The Queensland Train Manufacturing Program is building 65 six-car passenger trains at a purpose-built facility at Torbanlea, whose main manufacturing building has a floor plan of 30,650 m² with a rail connection to the North Coast line. Supply-chain and service businesses are following.

The region is close to a wind-design boundary. Geoscience Australia's indicative mapping places Maryborough and Hervey Bay in Region B1 but Bundaberg, to the north, in cyclonic Region C. Wind region is confirmed by the project engineer from AS/NZS 1170.2 for every site, and near a boundary that check matters. The Fraser Coast Planning Scheme 2014 applies.

Planning and site schedule: Fraser Coast

Planning and site information for Fraser Coast
CouncilFraser Coast Regional Council
Planning schemeFraser Coast Planning Scheme 2014 (commenced 28 January 2014)
Industrial areas
  • Queensland Train Manufacturing Program facility, Torbanlea: State train factory near Maryborough off the Bruce Highway with a rail connection to the North Coast Line
Nearest Builtwise officeabout 225 km straight line from the Crowley Vale head office

Local facts, with sources

Checked against official sources on 24 September 2026. Wind region is always confirmed by the project engineer from AS/NZS 1170.2 for the specific site.

  1. Planning

    The Fraser Coast Planning Scheme 2014 commenced on 28 January 2014; Council has consulted on Amendment Package 1 as part of a scheme review. Source

  2. Economy

    The Queensland Train Manufacturing Program is building 65 six-car passenger trains at a purpose-built facility at Torbanlea in the Fraser Coast region, operational in 2026. Source

  3. Freight & access

    The Torbanlea facility's main manufacturing building has a floor plan of 30,650 m², with a commissioning track and a rail connection to the North Coast line. Source

  4. Climate

    BoM station Maryborough (040126) records mean annual rainfall of 1,143.7 mm (1870–2026) and a mean January maximum of 30.8 °C. Source

  5. Climate

    BoM station Hervey Bay Airport (040405) records mean annual rainfall of 1,050.7 mm (1999–2026) and a mean January maximum of 30.3 °C. Source

  6. Population

    The 2021 Census counted 111,032 people in the Fraser Coast local government area (median age 51). Source

  7. Wind

    Geoscience Australia's geospatial interpretation of the AS/NZS 1170.2:2021 wind-region map places Maryborough and Hervey Bay in Region B1 (the 'SE Queensland' B1 zone) — the same dataset places Bundaberg, to the north, in cyclonic Region C, so the region boundary lies close by; GA states the dataset is indicative and not for design, so the project engineer must confirm the region from the Standard. Source

Towns covered from this page

Maryborough · Tiaro · Howard · Burrum Heads · Toogoom · Torbanlea

Fraser Coast: common questions

Which planning scheme applies to an industrial building in Fraser Coast?

Fraser Coast Regional Council assesses development under the Fraser Coast Planning Scheme 2014 (commenced 28 January 2014). The zone, precinct and overlays on your lot decide whether a warehouse or workshop is accepted, code assessable or impact assessable, so we check them for your address before design.

What wind region applies on the Fraser Coast?

Geoscience Australia's indicative dataset places Maryborough and Hervey Bay in Region B1 and Bundaberg in cyclonic Region C. The dataset is not for design, so the engineer confirms the region for each site from AS/NZS 1170.2.

Do you build in Maryborough and Hervey Bay?

Maryborough and the Fraser Coast towns in our service list are serviced. Site visits are scheduled as part of the project.

How far is Fraser Coast from a Builtwise office?

Fraser Coast is about 225 km straight line from the Crowley Vale head office. Regional: site visits scheduled with the project.

Planning a building in Fraser Coast?

Send the lot address, the rough size and what the building is for. We check the zoning and approval pathway, suggest the structure that suits and come back with a budget range.

Monday to Friday, 8 am to 5 pm (AEST). Brisbane office visits by appointment.

Start your project quote

Step 1/3

  1. 01 Project
  2. 02 Details
  3. 03 Contact

Prefer to talk? Call 07 2142 1772

Call our teamRequest a quote